【GRE写作】Argument 精选真题范文(四)
北京gre培训,gre课程,gre网课,gre培训机构,gre保分班,gre考试
「Question No. 13」
In an attempt to improve highway safety, Prunty County last year lowered
its speed limit from 55 to 45 miles per hour on all county highways. But this
effort has failed: the number of accidents has not decreased, and, based on
reports by the highway patrol, many drivers are exceeding the speed limit.
Prunty County should instead undertake the same kind of road improvement project
that Butler County completed five years ago: increasing lane widths, resurfacing
rough highways, and improving visibility at dangerous intersections. Today,
major Butler County roads still have a 55mph speed limit, yet there were 25
percent fewer reported accidents in Butler County this past year than there were
five years ago.
Write a response in which you discuss what specific evidence is needed to
evaluate the argument and explain how the evidence would weaken or strengthen
the argument.
Instruction:
短文的结论: It is concluded that Prunty County should undertake the same kind of
road improvement project that Butler County completed five years ago to replace
its reduction in the speed limit. 套话: The missing of the crucial pieces of
evidence renders the logic of the argument vulnerable.。
Body
逻辑点(1):「假 / 错误分母」:
首先指出欠缺的evidence是什么: The first piece of evidence the author omits to provide
is the total traffic volumes before the speed limit and after.
然后,具体分析欠缺的evidence的对于文章逻辑的影响: A large number of accidents out of a large traffic
volume may represent a small chance of accidents. Likewise, a small number of
accidents may represent great incidence of accidents if the traffic volume is
small. It is the proportion of the accidents to the total traffic volume that
decides the likelihood – the rate – of accidents, and the reduced rate is the
key to the improved level of highway safety, whereas the decrease in the number
of accidents is not without knowing the total number of cars on the highway.
【注意:论述时的措辞思路不一,只要说清楚明白即可。
措辞方面没有的的答案,但是逻辑的正确性。】
逻辑点(2):「地点差异」:
首先指出欠缺的evidence是什么: Another missing piece of evidence is the similarity
between the causes of accidents in Prunty County and those in Butler County.
然后,具体分析欠缺的evidence的对于文章逻辑的影响: The effectiveness of a road improvement project
may vary from county to county. In other words, the project may be effective in
Butler County and ineffective in Prunty County. If the causes of accidents in
the two counties are different, Butler County's experience may not be as
transferable as thought.
逻辑点(3):「它因」:
The reduction in the number of accidents in Butler County may not be
attributed to the road improvement project but to a number of other factors,
such as the decreased traffic volume, drivers’ improved driving behavior and
safety awareness. However, the argument provides no evidence to rule out these
possibilities, the causative relation between the project and the decreased
number of accidents is rendered vulnerable.
逻辑点(4):「时间断点」:
None of the annual numbers of accidents two years ago, three years ago and
four years ago are known. The lack of the crucial evidence renders it unclear
that the project has been effective or that last year was an instance that the
accidents decreased for other reasons as is mentioned before. Without having the
evidence, it is fair to believe that the annual number of accidents in the past
few years immediately after Butler County’s road improvement project increased,
and as a result, the project may not be as effective as thought.
逻辑点(5):「偷换概念」:
The author confuses reported accidents with accidents that actually took
place. 首先指出欠缺的evidence是什么:A piece of evidence that is missing at this point is
whether every accident that occurs is reported. 然后,具体分析欠缺的evidence的对于文章逻辑的影响:It
is not unlikely that some of the accidents were not reported when they happened,
and as a result, it is likely that the total number of accidents did not
decrease.
【可能还有逻辑点(6、7、8 …):写4到5个逻辑点即可。】
Conclusion
Unless the author provides the aforementioned evidence, which is however
omitted in the line of reasoning, Prunty County should not negate its reduction
in the speed limit or to undertake the same kind of road improvement project
that Butler County completed five years ago.
免费1对1规划学习方法
伦敦大学国王学院&硕士