《剑14》Test 3 小作文范文解析,制作工序的流程图咋写?

2024-04-26

来源: 易伯华教育

《剑14》Test 3 小作文范文解析,制作工序的流程图咋写?

雅思培训,雅思写作,雅思写作测试,雅思写作培训,雅思写作课程,易伯华教育

 今天,给同学们分享《剑14》Test 3 的小作文范文及解析,搬好小板凳,来看鸭~

《剑14》Test 3 小作文范文解析,制作工序的流程图咋写?

《剑14》Test 3 小作文:流程图

范文及解析

The diagram is an illustration of how electrical power is produced in

hydraulic electricity power plant.

[上来就是一个重要的点:不要按照图面上的进展顺序(从左到右)来,而是仔细观察图面后发现,其实这个发电厂的工作分成“白班”

(Day)和“晚班”(Night).] The power station works two shifts – the morning shift and

the night shift. [句话提示读者,作者的信息分组方式:“白班”(Day)和“晚班”(Night).]During the day,

electricity is generated. The dam obstructs the river’s waterflow and creates a

reservoir at a height [这是可数名词:“高处”]. At the bottom of the dam is a point of

entry, open during the day, and water isinjected, through it, into the tube

[对于图中不明确的空间的理解], reaching the reversible turbines and turning them.

[理解图中的文字信息从而理解工作原理,而不直接用图中给出的文字信息去措辞] With the turbines spinning, the generator

isactivated and produces electrical power. As soon as electricity is produced,

it is transmitted to the national grid. Meanwhile, water does not stay in

thechamber [对于图中不明确的空间的理解] where the turbines are placed and instead enters the

low-level reservoir.

[流程图的词汇重点在于动词:obstruct, create, inject, spin, activate, transmit]

The night shift works in reverse [固定词组:“相反地”]. Water is pumped back via the

daytime route, and it is noticeable that water does not flow through at the

intake point, which is closed at night.

Overall, the plant works around the clock, and the whole process is a

rather simple cycle.推荐阅读:雅思写作怎么复习才能取得!雅思小作文 | 只有8个数字的表格题该咋写?雅思写作提分技巧汇总!2019年3月9日雅思大作文真题参考范文

快速备考雅思知识点

免费1对1规划学习方法

易伯华 雅思知识点免费体验课
18小时免费体验课程
【18小时免费体验课程】

免费语言规划,留学规划

点击试听
  • 账号登录
社交账号登录